|
Datos del producto:
Pago y Envío Términos:
|
nombre: | Inmersión caliente poste para uso general de acero galvanizado del voltaje medio con el conductor de | Espesor: | 3mm |
---|---|---|---|
superficie acabada: | Inmersión caliente galvanizada | estándar: | ISO |
Torlance: | + - el 2% | Velocidad del viento máxima: | 30m/s |
Material: | Q235, Q345, Gr65 | Colar: | cualquier |
Alta luz: | polos eléctricos de la transmisión,polo de alto voltaje |
Medium Voltage Hot Dip Galvanized Steel Utility Pole With 30000m Aluminum Conductor
Product Name |
Medium Voltage Hot Dip Galvanized Steel Utility Pole With 30000m Aluminum Conductor |
Type |
Straight Pole ,Tensile Pole ,Turn Pole |
Suit for |
Electricity distribution |
Shape |
Conoid ,Multi-pyramidal,Columniform,polygonal or conical
|
Material |
Usually Q345B/A572,minimum yield strength>=345n/mm2 Q235B/A36,minimum yield strength>=235n/mm2
As well as Hot rolled coil from Q460 ,ASTM573 GR65, GR50 ,SS400, SS490, to ST52- |
Torlance of dimenstion |
+- 2% |
Power |
10 KV ~550 KV |
Safety Factor |
Safety factor for conducting wine : 8 Safety factor for grounding wine : 8 |
Design Load in Kg |
300~ 1000 Kg appliced to 50cm from the to pole |
Marks |
Nane palte through rivert or glue ,engrave ,emboss as per customer requirement |
Surface treatment |
Hot dip galvanized Following ASTM A 123, color polyester power or any other standard by client required.
|
Joint of Poles |
Insert mode,innerflange mode,face to face joint mode .
|
Design of pole |
Against earthquake of 8 grade |
Wind Speed |
160 Km/Hour . 30 m /s |
Minimum yield strength |
355 mpa |
Minimum ultimate tensile strength |
490 mpa |
Max ultimate tensile strength |
620 mpa |
Standard |
ISO 9001 |
Length of per section |
Within 14m once forming without slip joint |
Welding |
We has past flaw testing.Internal and external double welding makes the welding beautiful in shape
Welding Standard :AWS ( American Welding Society ) D 1.1
|
Thickness |
1 mm to 30 mm |
Production Process |
Rew material test → Cuttingj →Molding or bending →Welidng (longitudinal )→Dimension verify→Flange welding →Hole drilling →Calibration → Deburr→Galvanization or powder coating ,painting →Recalibration →Thread →Packages |
Packages |
Our poles as normal cover by Mat or straw bale at the top and bottom ,anyway also can following by client required , each 40HC or OT can loading how many pcs will calculation base on the client actually specification and data. |
Before shipment ,we have a final inspector manager to check the products on every detail and component to make sure it all meet the drawing .
Trade Terms:
1. Payment:(1)Telegraphic Transfer(30% advance payment, balance before shipment)
(2)Telegraphic Transfer(30% advance payment, balance against copy of documents)
(3)Letter of Credit: at sight
2. Lead Time: 2 weeks after confirmed order
3. Delivery way: by sea
corriente eléctrica poste del grueso NGCP de 3m m para la distribución de la electricidad
pintura de espray de la altura del 11.8m postes de acero galvanizados para el equipo de transmisión
línea de transmisión eléctrica redonda de acero galvanizada material del 12m GR 65 poste postes
poder de acero poste ASTM A123 del 12m S355 S500 galvanizado para el alumbrado público
El solo circuito echado a un lado multi galvanizó a poste de acero para la línea eléctrica 132kv